September saw the successful completion of the Wellington College Performing Arts Centre. This complex circular building with an approximate 10.5 million build cost was completed to the highest standards despite the building complexities.
A&G Structures provided all Architectural metalwork to the project which include back stage gantry handrails and lighting rails, back of house staircase balustrades and wall rails. Front of house stainless steel balustrades and auditorium balustrades, grab rails and wall rails.